top of page
IMG_5833.jpg

UNIVERSITY OF KENT

Sibson Building

Photo 15-06-2017, 11 10 47.jpg
IMG_5599.jpg
IMG_5763.jpg
IMG_5608.jpg
IMG_5807.jpg
IMG_5556-2.jpg
Photo 15-06-2017, 11 14 30.jpg
IMG_5565.jpg

THE RESULT.

To ensure success, DMA Signs and the 'Design Team' worked together to develop a coherent project management methodology. For the internal signage, it took 450 linear meters of vinyl to cover every required wall surface, selecting the most suitable products that would adhere the material to acid-etched glass. For the external signage, we fabricated monoliths from aluminium and incorporated a cut-through detail, to mirror the design of the internal graphics. Our client was delighted with the end result.

THE CHALLENGE.

DMA Signs were challenged to develop a sign family and produce cost effective, innovative and environmental graphic solutions to key aspects of the building. The challenge of the project was to confirm in advance, all dimensions to ensure stability, build ability and efficient manufacture, and develop in conjunction with the Main Contractor, scaled shop drawings for final approval prior to production. Timescales for the project were extremely tight, we were asked to install all signage over just two weekends - and, naturally, compromising on quality and finish to meet the deadline was not an option.

bottom of page